This projects objective was to develop a housing prototype for construction of 4000 single person dwelling units at Defence Force bases across Australia.

Single-LEAP_7

Because of the remote location of many of the sites, the project was developed to minimise on-site construction. The buildings are entirely pre-fabricated, with precast walls and floor units creating the structure and fully pre-fabricated kitchen bathroom units built in centralised locations and trucked to site.

070319---Holsworthy-Site-Plan

070323---Single-Leap-Phase-21

Single-LEAP_1

Single-LEAP_6

The units had to be designed to a precise brief of accommodation of 24 square metres plus private terrace with provision for under-cover car parking. A 24 unit module was developed that was capable of being constructed from in-situ footings up and with roof in place within 2 weeks.